This guide walks you through getting the most accurate construction cost estimate from Estima — from selecting the right category to downloading your PDF report.
Estima has two modes. Use Structured Estimate for maximum accuracy — it shows specific fields for your project type. Use Quick Estimate for a fast ballpark by describing your project in plain text.
Click the correct category from the 9 options. Each category uses a different engineering methodology, so selecting the right one is important for accuracy.
Type your country or city. Estima automatically detects the local currency and applies regional cost multipliers based on local labour rates and material costs.
Each category shows tailored fields — area, length, number of floors, wall height, road width, etc. The more accurately you fill these in, the more accurate your estimate will be.
Choose Economy, Standard, Premium, or Luxury. This reflects the quality of materials and finishes and has a significant impact on cost.
Estima runs the engineering calculation instantly and optionally fetches an AI market insight. Results include cost range in USD and local currency, full breakdown, materials, labour, timeline, and risks.
Click Download PDF Report to save a professional A4 report with all sections included — suitable for sharing with clients, contractors, or banks.
| Region | Currency | Coverage |
|---|---|---|
| USA | USD | All states |
| United Kingdom | GBP | England, Scotland, Wales |
| UAE | AED | Dubai, Abu Dhabi, all emirates |
| Pakistan | PKR | All provinces including KPK |
| Australia | AUD | All states |
| Canada | CAD | All provinces |
| India | INR | All states |
| Saudi Arabia | SAR | All regions |
| Qatar | QAR | Doha and surroundings |
| Europe | EUR | Germany, France, Netherlands, and more |
| Other countries | USD | Estimate in USD with local context |
→ Always specify the size in the correct unit (sq ft, sq meters, marla, linear meters)
→ Select the correct soil condition — poor soil can add 12–18% to foundation and wall costs
→ For roads, specify terrain — hilly terrain adds 15% due to earthwork complexity
→ For renovation, select the building age — pre-2000 buildings cost more due to hidden defects
→ Add 10–15% contingency to any estimate for unexpected site conditions
Contact us at sigmaconstructions508@gmail.com for any questions about using Estima or interpreting your estimate.